38-Story Residential Tower, MEP Coordination
A 38-story residential tower with a compressed design-build schedule left no tolerance for field conflicts. NorthRoom ran the full multi-discipline coordination program, federated model assembly, weekly clash detection, and Revizto issue tracking, while the client's internal team stayed focused on design decisions.
Client identity is confidential, per our anonymity policy, we never disclose which firms use production support.
Discuss a Similar Engagement0
0%
0 mo
Mechanical, plumbing, and electrical packages were being designed simultaneously by three separate firms. The design-build contractor needed a single coordination authority that could keep pace with weekly model drops and produce reports field crews would actually act on.
Our coordinators assembled the federated model weekly, ran discipline-by-discipline clash detection, and published prioritized Revizto issue reports with clear screenshots, locations, and proposed resolutions. Every report was triaged with the subcontractors in a weekly coordination meeting we facilitated.